Ver detalle
The service aimed to establish and meet the technical requirements for the design, material selection, fabrication, inspection, transport, assembly and start-up of a tank at the Caigua station of YPFB Chaco S.A., located near Villamontes.
Ver detalle
Coapecom SRL ensured the proper integration of all disciplines: mechanical, civil, electrical, instrumentation and control, guaranteeing full system functionality. The project established a reliable hydrocarbon gathering and monitoring system, optimizing field operations, enabling remote supervision via fiber optics and ensuring operational continuity in compliance with the client's quality and safety standards.
Ver detalle
MRU EPF: The process scheme of the MRU EPF unit was reconfigured to improve efficiency and operability. CPF1/2 plant sustainability: The MRU sequence was reconfigured to optimize operation and maintain process reliability. This project allowed Repsol to optimize the plants' operational efficiency, ensure the sustainability of the process units and guarantee mercury removal reliability, in compliance with the client's technical and safety standards.
Ver detalle
Ver detalle
Coapecom SRL ensured proper planning and execution of the assembly, meeting quality, safety and efficiency standards. The intervention ensured the structural functionality of the facilities, optimized workflows and guaranteed the durability of the infrastructure under demanding operating conditions.
Ver detalle
The project consisted of installing a new Sub-Low Pressure system, which included: • A new-generation gas separator • A K-610 compressor operating together with the existing K-1030 compressor, adapted to operate under new low and sub-low pressure conditions • A backup generator to ensure electrical continuity Coapecom SRL developed all the specialties involved, including process, mechanical/piping, pipeline, civil-structural, electrical, instrumentation, control and telecommunications, ensuring full system integration. The implementation of this project optimized the operation of the Sub-Low Pressure System, improved gas supply reliability and provided electrical backup for continuous operations, aligned with the client's strategic objectives.
Ver detalle
Ver detalle
The project was carried out in the Caranda field, where the existing infrastructure — including the access road, drilling pad and associated facilities — showed progressive deterioration due to the passage of time and operating conditions. In response to the need to bring a drilling rig back onto the CAR-X1005 well for new activities, Coapecom SRL carried out the comprehensive refurbishment and recovery of the critical areas, ensuring safe and functional conditions for continued operations. The intervention restored the operability of the facilities, optimized access logistics and ensured proper site preparation for future drilling activities.
Ver detalle
The service is provided on an "on-demand" basis, allowing the client to access specialized resources flexibly and promptly, according to operational needs at any given time. Coapecom SRL ensures a rapid response capacity, mobilizing personnel to the field upon the client's request. This approach optimizes operating costs, maintains operational efficiency and guarantees specialized technical support exactly when needed.
Ver detalle
The project was executed for YPFB Andina S.A., as part of the development of the Yarará field, located in the municipality of Yapacaní, Santa Cruz department, which is in a productive growth stage. As part of the production increase strategy, the need was identified to bring the YRA-X2 well online, which lacked surface facilities. To achieve this, Coapecom SRL built the necessary facilities and interconnected the well through a new gathering line to the YRA-X1 well pad, allowing its integration into the existing system and subsequent delivery to the Sirari gas processing plant. The implemented solution brought the YRA-X2 well into production, optimizing the use of field resources, increasing production capacity and contributing to the client's operational efficiency.
Ver detalle
The project is part of the Villamontes Pipeline Refurbishment Program led by YPFB Transporte S.A., aimed at ensuring the reliability and efficiency of the transport system. As part of this process, the previously developed basic and detailed engineering was validated, optimizing its field application. Initially, the project considered enabling the PVT-2 pipeline; however, this stage was later discarded, redefining the scope toward the integration and completion of works already executed. In this context, Coapecom SRL carried out the refurbishment and value enhancement of existing facilities, including the assembly and integration of pumping units (booster and main), ensuring system operability and contributing to the continuity of the hydrocarbon transport service.
Ver detalle
The project aimed to replace Gas Compression Unit No. 3 (UCG#3) at the Colpa Compression Station with the higher-capacity UCG#4010 unit, relocated from the Huayñacota Compression Station. This initiative is part of YPFB Transporte S.A.'s strategy to optimize its assets and strengthen the transport capacity of the Northern System, in response to the projected increase in domestic gas demand. The implemented solution increased the station's operating capacity, improved the efficiency of the compression system and ensured the continuity and reliability of gas supply, aligned with the client's strategic objectives.